Modern building technologies offer many options for flooring in a car garage. The choice of materials is limited only by the budget planned by the developer for such purposes. But in any case, in addition to overlapping the basement of the garage with concrete slabs, it is necessary at the first stage to fill the floors with concrete. The concrete mixture is prepared from crushed stone, sand and cement in a ratio of 7: 3: 1.
Necessary
- - building level,
- - fishing line for fishing with a diameter of 0.8 mm.
- - metal "beacons",
- - shovel,
- - a hammer,
- - concrete.
Instructions
Step 1
If the construction of a viewing pit is envisaged in the garage, then a formwork is installed around it, and along the walls, at some distance from them, about 10-20 cm, strictly according to the level, "beacons" are placed or pegs are hammered into the dump, the upper edge of which is trimmed along pre-stretched line.
Step 2
The surface of the future floor should be in an ideal horizontal plane, so the installation of formwork and "beacons" is done with great care. In this case, the most relevant folk wisdom: "measure seven times - cut once" (read - set).
Step 3
About a week after the concrete has been poured into the garage floor, further flooring work is carried out.
Step 4
From now on, as they say: "The taste and color …". Some are limited to the banal impregnation of concrete with the subsequent painting of the surface, while others can lay ceramic tiles on the floor.
Step 5
I would like to draw the attention of developers to such an option for arranging a garage as filling the floor with a polymer composition.
Step 6
Today, this type of floor covering, consisting of polymeric materials, is ideal for premises intended for transport.
Step 7
Polymer self-leveling floors have increased wear resistance. They do not deteriorate under the influence of fuels and lubricants, and there are no traces of studded rubber installed on the car on the floor during operation in the cold season.
Step 8
In addition, the arrangement of such floors requires a minimum investment of time, their filling is carried out within a few hours, and after three days it is already possible to drive into the garage by car.
Step 9
Another plus in favor of a polymer coating is the fact that pouring floors with a liquid composition can hide all the irregularities made at the preparatory stage, during the pouring of concrete in the garage.